Heliotrope 65 Catamaran Launch

Time:2015-10-12 Publisher:UNITED SHIPPING RIMEX LTDA Num:77

Day 1: Preparation

The CEA team measured out a 10-meter wide section of beach for excavation. A CEA excavator removed over three tonnes of sand and created a temporary slipway. 25 steel plates were laid on top of the slipway and into the sea with the final 8 plates only being laid after the tide had receded, this would allow the trailer and the boat to move safely along the beach during low tide.

Day 2: Launch Day
A CEA multi-axle hydraulic trailer positioned itself under the boat, wood chocks and rubber matting were placed under the agreed load points. The trailer was raised and took the full weight lifting the boat from its support stands. The boat was strapped and secured to the trailer and made the half mile journey to the launch site. At the launch site the trailer travelled along the steel plates and down the slipway. The trailer lowered the boat on to four jumbo bags filled with sand. As the tide was rising the bags were sliced open to allow the sand to dissipate in turn allowing the boat to float naturally.

Day 3: Clean Up
After the successful launch the previous day CEA returned to the location to restore the beach to its original state, this started with the recovery of the 25 steel plates followed by the collection of the used jumbo bags and finally moving the sand back to where the slipway had been and packing it down accordingly.

All of the above was achieved without any environmental impact.