Time:2015-10-12 Publisher:UNITED SHIPPING RIMEX LTDA Num:86
CEA were employed to pack and lash 77 units of Mud Skips, Cargo Baskets and Gas Racks into 14, 40ft HC containers, the cargo received was too wide to fit into the containers in a conventional way and would have to be turned on its side. CEA would ready the containers for load out and transport them to the port where the cargo would be shipped to Nigeria to be used in the offshore Oil & Gas sector.
Procedure
Wooden beams were placed on the floor in each of the containers, the cargo, on its side would be placed on these to ensure no damage occurred to the panels during loading, transportation and unloading. Lifting slings that would be used upon arrival in Nigeria were attached to each piece of cargo before packing.
A CEA reach stacker lifted each of the containers and placed them onto their sides upon wooden blocks. CEA fabricated specialized roller units to facilitate the loading, two units were placed underneath the front section to support the cargo while being loaded by forklift from the rear.
Manitou 3.5t forklift’s and pallet trucks loaded the cargo into the containers, both forklifts and pallet trucks were covered with protective materials to prevent any damage to the cargo.
After all Mud Skips, Cargo Baskets, and Gas Racks were loaded the CEA team lashed and secured them in place. Wooden chocks and stoppers were installed to further ensure no movement while transportation and shipping.
All necessary supporting documents were provided inside each container. A third party inspection team checked all loaded cargo and sealed the containers with the appropriate shipping tags. The containers were loaded onto flatbed trailers and transported to port to await shipping.