CEA Project Logistics were required to perform a technical lift and the loading of six BTS train carriages that were to be transported to the BTS headquarters in Bangkok.

Two CEA reach stackers fitted with specialised clamps lifted each carriage from their bogies. Hydraulic multi-axle trailers were moved into position beneath, each carriage was lowered with precision into their respective slots on the trailers. The CEA rigging team secured the carriages in place with ratchet straps and wooden chocks readying the carriages for transportation.

CEA PROVIDED

  • Manpower
  • Reach stackers (2)
  • Rigging equipment
  • Wooden chocks
  • Hiab crane
  • Forklift (7t)
  • Hydraulic trailer